Free Engineering Resource

The Component Design Checklist Every CNC Engineer Should Run Before Releasing a Drawing.

28 pre-release validation points used inside our DfM reviews. Catch tolerance stack-ups, datum errors, unmachinable corner radii and material-spec mismatches before the part hits the shop floor — the failures that quietly add 20–40% to your unit cost.

  • ✓  ASME Y14.5 datum & GD&T validation (8 checks)
  • ✓  Tolerance budget & stack-up triage (5 checks)
  • ✓  Material & heat-treatment specification (4 checks)
  • ✓  Geometry sanity — radii, depths, holes, threads (7 checks)
  • ✓  Surface, coating & inspection callouts (4 checks)

We email the PDF immediately. No newsletter — only quote-related correspondence.

What's inside the checklist

Datum & GD&T validation

Three-datum-feature rule, simultaneous requirement principle, MMC vs RFS callouts, datum-feature-of-size selection, profile-of-surface vs profile-of-line — and the eight signatures of a poorly applied datum frame.

Tolerance budget & stack-up

How to identify a stack-up before it ships, when to call basic dimensions vs limits, the five most common over-tolerancing patterns, and a reference table of process capability for CNC, VMC and 5-axis platforms.

Material & heat-treatment specs

Grade-and-condition callouts (don't say "aluminum" — say "6061-T6 per AMS-QQ-A-200/8"), case-hardening depth specs, surface hardness vs core hardness, and supply-chain-friendly substitution rules.

Geometry sanity checks

Internal radii vs cutter radius, pocket depth-to-width limits, drill depth-to-diameter limits, thread-relief grooves, undercut viability, fixturing pad allowance — the seven geometric flags that break manufacturability.

Surface & coating callouts

Ra vs Rz vs Rmr, when to call lay direction, anodise vs chromate vs passivation specifications, plating thickness on threaded features, and how to write a callout that the inspector can actually verify.

Inspection & PPAP-readiness

FAI scope decisions, balloon numbering conventions, key characteristic identification, inspection-frequency rules for production runs, and how to specify CMM reports without inflating cost.

Built from 1,000+ DfM reviews.

Every point in this checklist comes from a real drawing our manufacturing engineers had to flag during quoting. Use it once on your next release and you will catch at least one issue that would have cost you a revision cycle.

Already past design release?

Send the drawing — our engineers will run the checklist for you and revert with a quote and DfM notes within 24 business hours.

Submit Pro-RFQ →