Datum & GD&T validation
Three-datum-feature rule, simultaneous requirement principle, MMC vs RFS callouts, datum-feature-of-size selection, profile-of-surface vs profile-of-line — and the eight signatures of a poorly applied datum frame.
Free Engineering Resource
28 pre-release validation points used inside our DfM reviews. Catch tolerance stack-ups, datum errors, unmachinable corner radii and material-spec mismatches before the part hits the shop floor — the failures that quietly add 20–40% to your unit cost.
Three-datum-feature rule, simultaneous requirement principle, MMC vs RFS callouts, datum-feature-of-size selection, profile-of-surface vs profile-of-line — and the eight signatures of a poorly applied datum frame.
How to identify a stack-up before it ships, when to call basic dimensions vs limits, the five most common over-tolerancing patterns, and a reference table of process capability for CNC, VMC and 5-axis platforms.
Grade-and-condition callouts (don't say "aluminum" — say "6061-T6 per AMS-QQ-A-200/8"), case-hardening depth specs, surface hardness vs core hardness, and supply-chain-friendly substitution rules.
Internal radii vs cutter radius, pocket depth-to-width limits, drill depth-to-diameter limits, thread-relief grooves, undercut viability, fixturing pad allowance — the seven geometric flags that break manufacturability.
Ra vs Rz vs Rmr, when to call lay direction, anodise vs chromate vs passivation specifications, plating thickness on threaded features, and how to write a callout that the inspector can actually verify.
FAI scope decisions, balloon numbering conventions, key characteristic identification, inspection-frequency rules for production runs, and how to specify CMM reports without inflating cost.
Every point in this checklist comes from a real drawing our manufacturing engineers had to flag during quoting. Use it once on your next release and you will catch at least one issue that would have cost you a revision cycle.
Send the drawing — our engineers will run the checklist for you and revert with a quote and DfM notes within 24 business hours.
Submit Pro-RFQ →